Gasboy CFN Series Site Controller III Manual do Utilizador Página 29

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 86
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 28
MDE-4298D CFN Series Site Controller III Installation Manual · September 2009 Page 25
Conduit Layout/Installation Specifications System Layout
Consult the applicable section of this manual for specific system installation requirements.
The RS-485 junction box must be grounded as specified in “Power Requirements” on
page 32.
When used with Fuel Point, an extra dedicated junction box is supplied and should be
installed in the pump/dispenser. A separate, dedicated conduit should be run between the
junction box and the FPR. Refer to C35628 Fuel Point Reader Installation and Retrofit
Instructions Manual, for details.
When using an ICR2, refer to MDE-2713 Universal Distribution Box Installation Manual
for conduit layout/installation requirements of the Two-wire Current Loop
communications. For an overview of ICR2 Communication wiring, refer to
“ICR2
Communication Wiring” on page 37.
Vista de página 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 85 86

Comentários a estes Manuais

Sem comentários