Gasboy Q Manual do Utilizador Página 9

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 10
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 8
MDE-4369 Aviation Tubing Retrofit Kit for Gasboy® Q Models Kits M05023K001 & K05023K002 • October 2004 Page 9
Installing the M05023K002 Kit for Remote Dispensers
hold O-rings in place during assembly.)
10 Open shear valve.
11 Return power to pump and run fuel through the pump and inspect for leaks.
12 Purge all air from the unit (usually 10 gallons is recommended).
13 Remove catch basin, tools and absorbent materials. (Dispose of absorbent materials and fuels
in a safe manner. Do not dispose of them in station trash receptacles or in the pump pit box.)
14 Re-install the front and back doors to the pump.
Vista de página 8
1 2 3 4 5 6 7 8 9 10

Comentários a estes Manuais

Sem comentários