Introduction
03/07/03 1-3
WHAT YOU NEED FOR TESTING
To perform the testing portion of start-up, you will need:
• a digital voltmeter
• a 1/4 inch flat blade screwdriver
• a Phillips head #1 screwdriver
• a Phillips head #2 screwdriver
• a plastic 1/8 inch or smaller flat blade screwdriver
• socket handle 1/4" drive (NOTE: A socket bit #2, P/N C04479, for the island card reader is
shipped with every CFN Site Controller II System. This socket should be left with the end
user.)
• a tape measure
• Diskettes (2-4 blank double-sided, double-density for the SC II; 2 blank high density for the
Profit Point) or a PCMCIA 2Mb SRAM card for the Islander.
• An in-house Dsite chip is recomended as part of your start-up kit, although it is not required
for most startups.
We recommend that you bring all your tools and spare parts with you when doing a Start-
up.
FILLING OUT THE START-UP FORM
A sample filled-out Start-up form appears at the end of this manual. You should already have
blank copies of the Start-up form; however, if you do not, you can obtain more by calling GASBOY
Customer Service. Throughout the procedures in this manual, you will find double-outlined boxes
preceded by this symbol
✍ . This writing hand symbol tells you to "fill in" the start-up
information for the entries contained in the box.
When you encounter a box, fill in all the information requested. If an option is not used or does
not apply, fill in N/A (not applicable) in that space. It may be helpful to have the terminal operator
review the
Site Controller II Manager's Manual
, if he or she has not already done so, while you are
starting up the system.
The Start-up form must be filled out completely and sent, with the attachments noted in Section
14 of this manual, to:
GASBOY
Customer Service Dept.
707 N. Valley Forge Rd.
P.O. Box 309
Lansdale, Pa 19446
!
IMPORTANT: If the Startup Form is not filled out completely, it will be returned to
you for completion.
Be sure to keep a copy of this form for your own records.